Cacimbaes Thermal Power Plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Cancelled

The Brazilian company Espirito Santo Geradora de Energia S.A., a subsidiary of the Brazilian company Thermes Participacoes, was granted an authorization to build and operate a natural gas fueled power plant located in the state of Espirito Santo (127 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in April 2009.

The company committed to invest US$ 112 mil

Project Information FAQ

Project Information

4 Q
The project “Cacimbaes Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Espirito Santo Geradora de Energia S.A., a subsidiary of the Brazilian company Thermes Participacoes, was granted an authorization to build and operate a natural gas fueled power plant located in the state of Espirito Santo (127 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in April 2009. The company committed to invest US$ 112 million (BRL 224 million) in the construction of the power plant. Financial closure was achieved in May 2011, when a US$ 81.2 million (BRL 134 million) loan was granted by the state-owned institution Sudene. In 2008, Espirito Santo Geradora de Energia took part in a competitive bidding process and won the right to supply electricity in the regulated market starting in 2013. As of August 2011, construction works had not started. Due to delays in the implementation of the project, the regulatory agency cancelled the concession contract in December 2012 and applied the due penalties.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data