Cacimbaes Thermal Power Plant

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Cancelled

The Brazilian company Espirito Santo Geradora de Energia S.A., a subsidiary of the Brazilian company Thermes Participacoes, was granted an authorization to build and operate a natural gas fueled power plant located in the state of Espirito Santo (127 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in April 2009.

The company committed to invest US$ 112 mil

Status
Failure
Sector
Commercial, Natural Gas, Geothermal, Power Generation (CCGT), Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cacimbaes Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cacimbaes Thermal Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Espirito Santo Geradora de Energia S.A., a subsidiary of the Brazilian company Thermes Participacoes, was granted an authorization to build and operate a natural gas fueled power plant located in the state of Espirito Santo (127 MW in total capacity). The 35-year contract was signed with the regulatory agency ANEEL in April 2009. The company committed to invest US$ 112 million (BRL 224 million) in the construction of the power plant. Financial closure was achieved in May 2011, when a US$ 81.2 million (BRL 134 million) loan was granted by the state-owned institution Sudene. In 2008, Espirito Santo Geradora de Energia took part in a competitive bidding process and won the right to supply electricity in the regulated market starting in 2013. As of August 2011, construction works had not started. Due to delays in the implementation of the project, the regulatory agency cancelled the concession contract in December 2012 and applied the due penalties.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Natural Gas, Geothermal, Power Generation (CCGT), Government

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project