logo

Caculo Cabaça Hydroelectric Project

Sector: Hydro • Location: Angola

Source: Africa24 TV

Project
Under Construction

The Caculo Cabaça Hydroelectric Project is a hydroelectric power project in Angola set to produce 2,172 MW once completed. The first turbine is scheduled to operate in October 2026, with subsequent phases coming online through the end of 2028. The project is led by a consortium including Copia Group.

Status
Under Construction
Sector
Hydro, Wind, Oil and Gas, Power Generation (CCGT)
Location
Angola
Updated
22 Jul 2026
Source
Africa24 TV

ConstructChat

Ask ConstructChat about Caculo Cabaça Hydroelectric Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Caculo Cabaça Hydroelectric Project” is an infrastructure initiative in the Hydro sector, located in Angola. Taiyo aggregates data on it from Africa24 TV.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Caculo Cabaça Hydroelectric Project is a hydroelectric power project in Angola set to produce 2,172 MW once completed. The first turbine is scheduled to operate in October 2026, with subsequent phases coming online through the end of 2028. The project is led by a consortium including Copia Group.

Original sector

Energy

Location

Country

Angola

Source

Source

Africa24 TV

URL

More Details

Record type

Project

Sector

Hydro, Wind, Oil and Gas, Power Generation (CCGT)

Article published date

2026-03-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project