CA/DOT : Guardrail Improvement
Closed · California · Last reported Nov 2024
Source: Dodge USA
Contractor shall furnish all labor, materials, supplies, tools, parts, incidentals, travel, traffic control, disposal, and equipment necessary to repair and/or replace damaged Metal Beam Guardrail (MBGR), Midwest Guardrail System (MGS) barrier, Thrie Beam Barrier, Terminal Systems, Crash Cushions, Transition Railings, End Anchor Assemblies, channel rail, and other highway components for the Califo
- Status
- Closed
- Sector
- Metal, Mass Transit, Rail, Commercial, Road
- Location
- Riverside, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CA/DOT : Guardrail Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor shall furnish all labor, materials, supplies, tools, parts, incidentals, travel, traffic control, disposal, and equipment necessary to repair and/or replace damaged Metal Beam Guardrail (MBGR), Midwest Guardrail System (MGS) barrier, Thrie Beam Barrier, Terminal Systems, Crash Cushions, Transition Railings, End Anchor Assemblies, channel rail, and other highway components for the California Department of Transportation (Caltrans) on a routine or non-routine basis. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Riverside |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Mass Transit, Rail, Commercial, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
