CA/DOT: Cured In Place Pipeliner Improvements
Sector: Water Supply and Storage • Location: California, United States of America
Source: Dodge USA
06-Ker-155-R54.8/R59.1 . Cured in-place pipeliner, remove and replace culverts and inlets. In Kern County Near Alta Sierra At Various Locations From 0.6 Mile East Of Alta Sierra Road To 0.3 Mile East Of Calgary Drive The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-42. 40 Working Days * 5% DVBE Requirement. * Small Busin
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CA/DOT: Cured In Place Pipeliner Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 06-Ker-155-R54.8/R59.1 . Cured in-place pipeliner, remove and replace culverts and inlets. In Kern County Near Alta Sierra At Various Locations From 0.6 Mile East Of Alta Sierra Road To 0.3 Mile East Of Calgary Drive The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-42. 40 Working Days * 5% DVBE Requirement. * Small Business Preference applies.5% SBE Requirement * |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
