CA/DOT: Paving Improvement (CO 001)
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Place JPCP (RSC) and RHMA, and modify electrical systems. Construction On State Highway In Los Angeles And Orange Counties From 0.1 Mile West Of The Los Angles County Line In Cerritos To 0.1 Mile East Of Acacia Street Undercrossing In Anaheim In District 07,12 On Route 91
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Consumer Products, Commercial
- Location
- Anaheim, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CA/DOT: Paving Improvement (CO 001)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Place JPCP (RSC) and RHMA, and modify electrical systems. Construction On State Highway In Los Angeles And Orange Counties From 0.1 Mile West Of The Los Angles County Line In Cerritos To 0.1 Mile East Of Acacia Street Undercrossing In Anaheim In District 07,12 On Route 91 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Anaheim |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Consumer Products, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
