CA/DOT: Rte 92 & 101 Bridge Widening & Curb Ramp
Sector: Car parking • Location: San Mateo, California, United States of America
Source: Dodge USA
Bridge widening, HMA, curb ramp, Conc barrier, mod electrical system. Construction On State Highway In San Mateo County In Foster City And San Mateo On Route 92 From 0.2 Mile East Of South Delaware Street Undercrossing To 0.3 Mile West Of Vintage Park Overcrossing And On Route 101 From 0.3 Mile South Of East Hillsdale Boulevard Overcrossing To 0.3 Mile North Of Route 92/101 Separation.
- Status
- Prospective
- Sector
- Car parking, Road, Power Generation (CCGT), Bridge, Automotive, Commercial
- Location
- San Mateo, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CA/DOT: Rte 92 & 101 Bridge Widening & Curb Ramp
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge widening, HMA, curb ramp, Conc barrier, mod electrical system. Construction On State Highway In San Mateo County In Foster City And San Mateo On Route 92 From 0.2 Mile East Of South Delaware Street Undercrossing To 0.3 Mile West Of Vintage Park Overcrossing And On Route 101 From 0.3 Mile South Of East Hillsdale Boulevard Overcrossing To 0.3 Mile North Of Route 92/101 Separation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Mateo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Power Generation (CCGT), Bridge, Automotive, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
