CA/DOT: Various Location Guardrail Replace
Closed · California · Last reported Jul 2025
Source: Dodge
Contractor agrees to provide to the California Department of Transportation (Caltrans) Guardrail Services as described herein. Contractor shall furnish all labor, materials, supplies, tools, parts, incidentals, travel, traffic control, disposal, and equipment necessary to repair and/or replace damaged Metal Beam Guardrail (MBGR), Midwest Guardrail System (MGS) barrier, Thrie Beam Barrier, Terminal
- Status
- Closed
- Sector
- Metal, Mass Transit, Road, Commercial, Rail
- Location
- Los Angeles, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CA/DOT: Various Location Guardrail Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor agrees to provide to the California Department of Transportation (Caltrans) Guardrail Services as described herein. Contractor shall furnish all labor, materials, supplies, tools, parts, incidentals, travel, traffic control, disposal, and equipment necessary to repair and/or replace damaged Metal Beam Guardrail (MBGR), Midwest Guardrail System (MGS) barrier, Thrie Beam Barrier, Terminal Systems, Crash Cushions, Transition Railings, End Anchor Assemblies, channel rail, and other hig... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Los Angeles |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Mass Transit, Road, Commercial, Rail |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
