Complete

The EBRD is considering an equity investment in Central-Asian Electric Power Corporation (CAEPCo), a private energy holding of power utility companies in Pavlodar, Petropavlovsk, Ekibastuz and Astana, to finance major rehabilitation investments aimed at enhancing energy efficiency and improving the environmental standard of power generation and distribution assets. The project will support a dynam

Project Information FAQ

Project Information

3 Q
The project “CAEPCo Equity (F. Northern Lights)” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering an equity investment in Central-Asian Electric Power Corporation (CAEPCo), a private energy holding of power utility companies in Pavlodar, Petropavlovsk, Ekibastuz and Astana, to finance major rehabilitation investments aimed at enhancing energy efficiency and improving the environmental standard of power generation and distribution assets. The project will support a dynamic local private sponsor active in the power utility sector in Kazakhstan. It will facilitate implementation of an ambitious investment programme leading to significant improvements in efficiency and environmental standards, in line with the Sustainable Energy Action Plan signed between the EBRD and the Government of Kazakhstan in June 2008. The transaction will demonstrate to other market participants that tangible investments in the power sector can be pursued based on tariff increases approved within the existing regulatory framework in Kazakhstan. The Bank’s participation as an equity investor in the company will also facilitate the future IPO to further diversify the investors’ base and attract interest from the private sector. Investee: Central-Asian Electric Power Corporation (CAEPCo), a private energy holding of power utility companies in major cities of Northern Kazakhstan. Sponsor: Central-Asian Power-Energy Company (CAPEC), a private holding company with interests in the energy, industrial and financial sectors in Kazakhstan. The Bank is considering an equity investment in CAEPCo potentially along with other local private strategic investors. Subject to final valuation. Screening category and applicable performance requirements The Project has been screened B, requiring an Environmental and Social Due Diligence (ESDD) consisting of a corporate environmental and social review of existing operations and an environmental analysis of the planned investment programme. Environmental and social impacts from the operation and upgrade of combined heat and power plants as well as district heating and electricity distribution systems can be readily identified, assessed and mitigated. Key Environmental and Social Issues and due diligence results The main environmental issue is associated with energy efficiency as well as air emissions from the generating assets. Waste management and water use could also raise significant issues and needs to be assessed. The environmental and social due diligence confirmed that the current and planned operations are in compliance with National environmental standards and the planned investment programme is structured to meet National and EU environmental standards. Overall, the proposed project will further improve the environmental performance of the Company and allow for higher energy efficiency levels and future compliance with best international environmental standards and practices. Summary of Environmental and Social Action Plan As a result of the environmental and social due diligence, a comprehensive ESAP has been prepared to address future operations of the Company and implementation of the Bank’s Performance Requirements (PRs). This includes the development of a systematic approach to environmental issues at the Company and individual site level, including the implementation of an environmental, health and safety management system as well as further investments to reduce energy use as well as improve the abatement of air emissions and wastewater in line with best international practice. The Company plans to continue to invest to improve health and safety. A Stakeholder Engagement Programme (SEP) has been developed by the Company, which will include the publication of annual information on environmental and social matters on the Company’s web sites, as well as local information in local newspapers, as appropriate. A grievance mechanism will be maintained by the Company. The implementation of the investment program as agreed in the ESAP is structured to allow the attainment of Kazakh as well as EU environmental standards and will significantly improve the company’s environmental management and overall performance. However, the coal fired power plants will not attain emission value levels (EVL) as required for existing plants under the EU Large Combustion Plant (LCP) Directive in the medium to long term. The planned use of wet scrubbers will significantly reduce emissions of SOx and dust in a cost effective manner and will result in significant improvement of local air quality and therefore improved public health. The agreed EVL will be more stringent than Kazakh requirements post 2013 and will result in visible and tangible improvements. The Company will undertake additional Best Available Technique (BAT) Assessments to identify additional improvements to operations as part of implementing an Environmental, health and safety management system. Implementation requirements None. Gulnara Artambayeva, President of CAPEC E-mail: G.artambayeva@energy.kz

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data