logo

Cagayan de Oro Solar Power Project

Sector: Solar • Location: Philippines

Source: World Bank Group

Project
Active

In August of 2003, Cagayan Electric Power & Light Co., Inc. (CEPALCO) began construction works on a US$5.3 million solar power project in Cagayan de Oro on the island of Mindanao. The 1-MW, 6,480 solar cell unit project was to be the largest distributed, grid-connected photovoltaic installation in the developing world and was to supply power to not less than 770 Cepalco residential consumers. Su

Project Information FAQ

Project Information

4 Q
The project “Cagayan de Oro Solar Power Project” is an infrastructure initiative in the Solar sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In August of 2003, Cagayan Electric Power & Light Co., Inc. (CEPALCO) began construction works on a US$5.3 million solar power project in Cagayan de Oro on the island of Mindanao. The 1-MW, 6,480 solar cell unit project was to be the largest distributed, grid-connected photovoltaic installation in the developing world and was to supply power to not less than 770 Cepalco residential consumers. Sumitomo Corporation of Japan was the turnkey contractor for the project and the solar modules were manufactured by Sharp Corporation of Japan. Commercial operation commenced when the plant was issued a Certificate of Compliance by the Energy Regulatory Commission on September 22, 2004. CEPALCO was one of five electricity distribution utilities serving the Northern Mindanao region in the Philippines. The private company operated electricity distribution services in the city of Cagayan de Oro and the municipalities of Tagoloan, Villanueva, and Jasaan, all in the province of Misamis Oriental in the island of Mindanao under an exclusive franchise awarded in 1961. The legislative franchise was to be extended for another 25 years starting in 2011. CEPALCO was a closely held company, where the Abaya family was the founding and the major shareholder. The combined four top shareholders (Fullmax Philippine Development, LLC, Abaya Investments Corporation, Breavel, Inc., and the Abaya family) together owned 63.1% of the company. In June of 2003, The International Finance Corp. (IFC) agreed to provide US$4 million to finance the project from its Global Environment Facility (GEF), a financing window for innovative applications of renewable energy technologies. IFC said the loan may be converted into a grant after five years if certain conditions were met. Cepalco invested the remaining US$1.4 million as equity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data