Cahora Bassa Hydropower Plant Rehabilitation
Sector: Water Supply and Storage • Location: Mozambique
Source: International Water Power
Hidroeléctrica de Cahora Bassa (HCB) has awarded a contract to ANDRITZ for the rehabilitation of the Cahora Bassa hydropower plant. The project aims to improve efficiency, reliability, availability, and maintainability, increasing turbine capacity by over 4%. ANDRITZ will deliver new generators, turbine runners, control and protection systems, and hydromechanical equipment, covering design, engine
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Hydro, Wind
- Location
- Mozambique
- Updated
- 22 Jul 2026
- Source
- International Water Power
ConstructChat
Ask ConstructChat about Cahora Bassa Hydropower Plant Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hidroeléctrica de Cahora Bassa (HCB) has awarded a contract to ANDRITZ for the rehabilitation of the Cahora Bassa hydropower plant. The project aims to improve efficiency, reliability, availability, and maintainability, increasing turbine capacity by over 4%. ANDRITZ will deliver new generators, turbine runners, control and protection systems, and hydromechanical equipment, covering design, engineering, manufacturing, supply, installation, testing, and commissioning. Work will be phased to maintain continuous power generation and coordinate with the nearby Songo Converter Substation rehabilitation. |
Original sector | Energy |
Budget |
Location
Country | Mozambique |
Source
Source | International Water Power |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Hydro, Wind |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Mozambique
- Aguas de Mocambique (Maputo and Matola)
- Aguas de Mocambique (Beira, Quelimane, Nampula, and Pemba)
- Maputo Port
- MAPUTO WATER SUPPLY
- Mozambique - The Massingir Dam Emergency Rehabilitation Project
- Mozambique - Urban Water Supply Sanitation and Institutional Support Project
- MOZAL S.A.R.L.
- Central Térmica de Temane
