CAIRO METRO LINE 1 UPGRADING AND RENOVATION
The status, timeline and source of this project. A free account opens every field.
Source: European Investment Bank (EIB)
The project consists of the rehabilitation of metro line 1 of the Cairo metro network. The rehabilitation includes the upgrading of the signalling system, the telecommunications system, the electromechanical system, the centralized control system and the power supply system. Parts of the tracks will also be renewed.
- Status
- Prospective
- Sector
- Mass Transit, Power Generation (CCGT), Telecommunications, Government, Consumer Products, Raw Materials, Tunnel
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about CAIRO METRO LINE 1 UPGRADING AND RENOVATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | financed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of the rehabilitation of metro line 1 of the Cairo metro network. The rehabilitation includes the upgrading of the signalling system, the telecommunications system, the electromechanical system, the centralized control system and the power supply system. Parts of the tracks will also be renewed. |
Original sector | Transport |
Budget |
Location
Country | Egypt |
Source
Source reliability | High |
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Power Generation (CCGT), Telecommunications, Government, Consumer Products, Raw Materials, Tunnel |
Article published date | 2023-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
