CAISO 2025/26 Transmission Plan
Sector: Energy • Location: California, United States
Source: RTO Insider
The California Independent System Operator (CAISO) Board of Governors approved the ISO's 2025/26 transmission plan which includes 38 projects with a total investment of $6.8 billion. The plan aims to meet reliability needs and accommodate load growth in the region. Additionally, a $1.1 billion transmission project in Southern California was canceled.
- Status
- Prospective
- Sector
- Energy
- Location
- California, United States of America
- Updated
- 19 Nov 2026
- Source
- RTO Insider
ConstructChat
Ask ConstructChat about CAISO 2025/26 Transmission Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The California Independent System Operator (CAISO) Board of Governors approved the ISO's 2025/26 transmission plan which includes 38 projects with a total investment of $6.8 billion. The plan aims to meet reliability needs and accommodate load growth in the region. Additionally, a $1.1 billion transmission project in Southern California was canceled. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | California |
Source
Source | RTO Insider |
URL |
More Details
Record type | Project |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
