In December 2011, the Brazilian state-owned company Copel (49%) and the Spanish company Elecnor (51%) were awarded in a competitive bidding process the contract to build and operate the 136-km transmission line connecting Umuarama-Guaira and Cascavel Oeste-Norte, located at the state of Parana. The project also included the construction of two new substations: Cascavel Norte ( 300 MVA) and Santa

Project Information FAQ

Project Information

4 Q
The project “Caiua Transmissora de Energia” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2011, the Brazilian state-owned company Copel (49%) and the Spanish company Elecnor (51%) were awarded in a competitive bidding process the contract to build and operate the 136-km transmission line connecting Umuarama-Guaira and Cascavel Oeste-Norte, located at the state of Parana. The project also included the construction of two new substations: Cascavel Norte ( 300 MVA) and Santa Quiteria (400 MVA). Two other companies took part in the contest: ABENGOA CONCESSOES BRASIL HOLDING S/ A; and ALUPAR INVESTIMENTO S/A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Copel and Elecnor presented the lowest offer, a total value of US$ 10.8 million (BRL 17.7 million), 23% below the ceiling set by the regulatory agency. The contract was signed in May 2012, and the sponsor created the company Caiua Transmissora de Energia S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 91.6 million (BRL 215.7 million) in the transmission line. In December 2013, Caiua Transmissora was awarded a US$ 35.9 million (BRL 84.6) million loan from the state-owned bank BNDES. Environmental clearance was awarded in early 2013. Construction works commenced in April 2013 and were expected to be concluded by May 2014. The project was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. In January 2014, Brazilian private bank Bradesco approved a US$ 17.9 million (BRL 42 million) loan to the company. Commercial operations commenced in July 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data