Caldas Novas Transmissora

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

In December 2010, Consorcio Caldas Novas was awarded in a competitive bidding process the contract to build and operate the Corumba Substation, located at the state of Mato Grosso do Sul. Consorcio Caldas Novas was established as a partnership of the state-owned Brazilian company Furnas (49,9%), and the Brazilian companies Desenvix Energias Renovaveis SA (25%), Construtora Santa Rita Comercio e I

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Caldas Novas Transmissora

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Caldas Novas Transmissora” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2010, Consorcio Caldas Novas was awarded in a competitive bidding process the contract to build and operate the Corumba Substation, located at the state of Mato Grosso do Sul. Consorcio Caldas Novas was established as a partnership of the state-owned Brazilian company Furnas (49,9%), and the Brazilian companies Desenvix Energias Renovaveis SA (25%), Construtora Santa Rita Comercio e Instalacoes (12,525%) e CEL Engenharia (12,535%). Four other companies took part in the contest: ?? ABENGOA CONCESSOES BRASIL HOLDING S/ A; ALUPAR INVESTIMENTO S/A; CONSORCIO PIRINEUS; and ORTENG EQUIPAMENTOS E SISTEMAS. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Caldas Novas presented the lowest offer, a total value of US$ 1.8 million (BRL 3.3 million), 20% below the ceiling set by the regulatory agency. The contract was signed in May 2012, and the sponsor created the company Caldas Novas Transmissora S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 9.9 million (BRL 23.3 million) in the transmission line. In December 2013, Caldas Novas Transmissora was awarded a US$ 6.9 million (BRL 16.2) million loan from the state-owned bank BNDES. Environmental clearance was awarded in early 2013. Construction works commenced in May 2012 and were concluded by August 2013. Commercial operations started in August 2013. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project