In December 2010, Consorcio Caldas Novas was awarded in a competitive bidding process the contract to build and operate the Corumba Substation, located at the state of Mato Grosso do Sul. Consorcio Caldas Novas was established as a partnership of the state-owned Brazilian company Furnas (49,9%), and the Brazilian companies Desenvix Energias Renovaveis SA (25%), Construtora Santa Rita Comercio e I
- Status
- Prospective
- Sector
- Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial)
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Caldas Novas Transmissora
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In December 2010, Consorcio Caldas Novas was awarded in a competitive bidding process the contract to build and operate the Corumba Substation, located at the state of Mato Grosso do Sul. Consorcio Caldas Novas was established as a partnership of the state-owned Brazilian company Furnas (49,9%), and the Brazilian companies Desenvix Energias Renovaveis SA (25%), Construtora Santa Rita Comercio e Instalacoes (12,525%) e CEL Engenharia (12,535%). Four other companies took part in the contest: ?? ABENGOA CONCESSOES BRASIL HOLDING S/ A; ALUPAR INVESTIMENTO S/A; CONSORCIO PIRINEUS; and ORTENG EQUIPAMENTOS E SISTEMAS. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Caldas Novas presented the lowest offer, a total value of US$ 1.8 million (BRL 3.3 million), 20% below the ceiling set by the regulatory agency. The contract was signed in May 2012, and the sponsor created the company Caldas Novas Transmissora S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 9.9 million (BRL 23.3 million) in the transmission line. In December 2013, Caldas Novas Transmissora was awarded a US$ 6.9 million (BRL 16.2) million loan from the state-owned bank BNDES. Environmental clearance was awarded in early 2013. Construction works commenced in May 2012 and were concluded by August 2013. Commercial operations started in August 2013. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Power Generation (CCGT), Steel, Manufacturing (Industrial) |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia