Caldas Novas Transmissora
Sector: Steel • Location: Brazil
Source: World Bank Group
In December 2010, Consorcio Caldas Novas was awarded in a competitive bidding process the contract to build and operate the Corumba Substation, located at the state of Mato Grosso do Sul. Consorcio Caldas Novas was established as a partnership of the state-owned Brazilian company Furnas (49,9%), and the Brazilian companies Desenvix Energias Renovaveis SA (25%), Construtora Santa Rita Comercio e I
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In December 2010, Consorcio Caldas Novas was awarded in a competitive bidding process the contract to build and operate the Corumba Substation, located at the state of Mato Grosso do Sul. Consorcio Caldas Novas was established as a partnership of the state-owned Brazilian company Furnas (49,9%), and the Brazilian companies Desenvix Energias Renovaveis SA (25%), Construtora Santa Rita Comercio e Instalacoes (12,525%) e CEL Engenharia (12,535%). Four other companies took part in the contest: ?? ABENGOA CONCESSOES BRASIL HOLDING S/ A; ALUPAR INVESTIMENTO S/A; CONSORCIO PIRINEUS; and ORTENG EQUIPAMENTOS E SISTEMAS. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Caldas Novas presented the lowest offer, a total value of US$ 1.8 million (BRL 3.3 million), 20% below the ceiling set by the regulatory agency. The contract was signed in May 2012, and the sponsor created the company Caldas Novas Transmissora S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 9.9 million (BRL 23.3 million) in the transmission line. In December 2013, Caldas Novas Transmissora was awarded a US$ 6.9 million (BRL 16.2) million loan from the state-owned bank BNDES. Environmental clearance was awarded in early 2013. Construction works commenced in May 2012 and were concluded by August 2013. Commercial operations started in August 2013. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
