Calgary Board of Education K-4 School Bundle
One of 10,000+ projects Taiyo tracks in Canada.
Source: Bird Construction
This project comprised the simultaneous construction of three new K-4 Schools in Calgary. All three schools followed the same design consisting of a central lobby with wings running out from it, as well as peaked roofs that allowed for ground to ceiling windows to let in natural light. The schools were all turned over on budget and on schedule for the start of the school year. With a 3,498-square-
- Status
- Unknown
- Sector
- Commercial, Education, Solar, Power Transmission, Residential, Power Generation (CCGT), Government
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about Calgary Board of Education K-4 School Bundle
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project comprised the simultaneous construction of three new K-4 Schools in Calgary. All three schools followed the same design consisting of a central lobby with wings running out from it, as well as peaked roofs that allowed for ground to ceiling windows to let in natural light. The schools were all turned over on budget and on schedule for the start of the school year. With a 3,498-square-metre footprint, each school features numerous classrooms, a gymnasium, a library, administration offices plus a mechanical room on the second floor. The Owner required the project to be sustainable by attaining LEED® Silver certification and incorporating solar photovoltaic panels on the roofs. We utilized VDC/BIM on all three of these schools. |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Solar, Power Transmission, Residential, Power Generation (CCGT), Government |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
