Calgary Composting Facility
Sector: Cement • Location: Canada
Source: Bird Construction
The Calgary Composting Facility is the largest facility of its kind in Canada, and the first LEED® v4 Gold registered commercial building in Alberta. The immense plant processes more than 145,000 metric tonnes of source-separated organics and dewatered biosolids every year, and covers 150,000 square metres. The main composting building has a 31,000-square-metre footprint (an area equivalent to eig
- Status
- Unknown
- Sector
- Cement, Commercial, Education, Tunnel, Waste Processing and Treatment, Government
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about Calgary Composting Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Calgary Composting Facility is the largest facility of its kind in Canada, and the first LEED® v4 Gold registered commercial building in Alberta. The immense plant processes more than 145,000 metric tonnes of source-separated organics and dewatered biosolids every year, and covers 150,000 square metres. The main composting building has a 31,000-square-metre footprint (an area equivalent to eight football fields) and includes a tipping floor where organic intake is performed, a shredding area, sealed in-vessel concrete composting tunnels with underfloor aeration and sprinklers, a curing building, and a storage building. Acid baths and large biofilters treat all outflowing air to eliminate odours. There is also an outdoor learning garden and classroom overlooking the composting facility that is used as part of a public education initiative. All rainwater on the site is harvested for use in the facility. |
Procurement method |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Education, Tunnel, Waste Processing and Treatment, Government |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
