Calhoun County Park Bath & Shower Facilities
Sector: Power Transmission • Location: Grantsville, West Virginia, United States of America
Source: Dodge USA
The Calhoun County Park Bath and Shower Facilities is a split face CMU building with pre-engineered wood trusses and corrugated metal roof. Utilities are located at adjacent Community Building that include water, electric, and gas. Sanitary connections are to be made to new septic system installed separately by Owner. The plan includes restrooms on either side of a central mechanical room and a se
- Status
- Closed
- Sector
- Power Transmission, Metal, Commercial, Car parking, Water Supply and Storage, Power Generation (CCGT), Automotive, Government, Manufacturing (Industrial)
- Location
- Grantsville, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Calhoun County Park Bath & Shower Facilities
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Calhoun County Park Bath and Shower Facilities is a split face CMU building with pre-engineered wood trusses and corrugated metal roof. Utilities are located at adjacent Community Building that include water, electric, and gas. Sanitary connections are to be made to new septic system installed separately by Owner. The plan includes restrooms on either side of a central mechanical room and a series of individual showers along the back. At each gable end the roof structure extends with a 5'... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Grantsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Metal, Commercial, Car parking, Water Supply and Storage, Power Generation (CCGT), Automotive, Government, Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
