Calhoun Street Reconstruction
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: 790 feet north of 52nd Avenue to 54th Avenue Length: Approximately 1.2 miles District: 4 Community: Vista Santa Rosa
The County of Riverside Transportation Department is proposing to resurface approximately 1.2 miles of Calhoun Street from 790 feet north of 52nd Avenue to 54th Avenue. Calhoun Street is classified as a local road in the County of Riversides General Plan. Calhoun St is a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: 790 feet north of 52nd Avenue to 54th Avenue Length: Approximately 1.2 miles District: 4 Community: Vista Santa Rosa The County of Riverside Transportation Department is proposing to resurface approximately 1.2 miles of Calhoun Street from 790 feet north of 52nd Avenue to 54th Avenue. Calhoun Street is classified as a local road in the County of Riversides General Plan. Calhoun St is a two lane road and currently ranges 23-24 feet wide. The proposed project will pulverize the roadway and overlay with Hot Mix Asphalt (HMA). Additional improvements include: Reconstruction of asphalt concrete driveway Placement of safety edge and shoulder backing Minor paved shoulder widening Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way, permits to enter and construct (PEC), or temporary construction easements (TCE) will be required to construct the proposed improvements. The project improvements will not be within the existing footprint of the roadway and will raise the existing roadway profile by 0.40 in the overlay areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
