Cali - Candelaria - Florida Toll Road
Active · Valle del Cauca
Source: World Bank Group
In 1995 the Department of Valle del Cauca held negotiated bidding procedures and awarded a 22-year concession to construct, maintain, and operate the road to CISA, whose proposal called for the lowest toll structure (the peso equivalent of approximately $1.70 per passenger car trip) of the three groups competing. The departmental government also agreed to guarantee 90% of projected toll revenues,
- Status
- Prospective
- Sector
- Automotive, Bridge, Government, Road, Commercial
- Location
- Valle del Cauca, Colombia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cali - Candelaria - Florida Toll Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 1995 the Department of Valle del Cauca held negotiated bidding procedures and awarded a 22-year concession to construct, maintain, and operate the road to CISA, whose proposal called for the lowest toll structure (the peso equivalent of approximately $1.70 per passenger car trip) of the three groups competing. The departmental government also agreed to guarantee 90% of projected toll revenues, and its finances are considered more than adequate to cover these payments if necessary. The departmental governmental also allowed the concessionaires to adjust the tolls for inflation once a year, or more if the accumulated inflation rate exceeds 10% since the time of the last adjustment. The winning consortium was Concesiones de Infraestructuras S.A. (CISA), a consortium made up of Grupo Ferrovial (Spain),Construcciones Civiles (Colombia), and Cruz Blanca (Chile). The project included rehabilitation of an existing road (14.7 km), construction of a parallel roadway (17.4 km), two bridges and traffic circles. The project has been debt financed (including a US$ 10 million loan from the IADB in 1997). The expected daily traffic volume was 8,600 vehicles. Ferrovial Group owns 94% of the project company shares. Financing Package: Approximately 60/40 debt equity ratio. Equity: $14.5 million from sponsors and $5 million from projected internal cash generation from toll road revenues; Debt: $10 million, 10-year IDB loan at LIBOR plus at least 325 bp and another loan for the peso-equivalent of $19.5 million from local banks. http://www.iadb.org/sds/doc/1243eng.pdf None |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Colombia |
State | Valle del Cauca |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Automotive, Bridge, Government, Road, Commercial |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
