Caliber Collision Auto Body (Spring Hill TN)
Sector: Automotive • Location: Spring Hill, Tennessee, United States of America
Source: Dodge USA
We are pleased to invite you to bid on the ground up construction of a new 16,345 square foot Caliber Collision Facility in Spring Hill, TN. The Caliber will be located on a virgin site on Sandia Court. Scopes of work include: Surveying/Layout, Erosion Control, Earthwork/Grading, Asphalt Paving, Lot Striping, Curbing, Concrete paving, Concrete retaining wall, Fencing & Gates, Site Utilities, Storm
- Status
- Closed
- Sector
- Automotive, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Metal, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Spring Hill, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Caliber Collision Auto Body (Spring Hill TN)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | We are pleased to invite you to bid on the ground up construction of a new 16,345 square foot Caliber Collision Facility in Spring Hill, TN. The Caliber will be located on a virgin site on Sandia Court. Scopes of work include: Surveying/Layout, Erosion Control, Earthwork/Grading, Asphalt Paving, Lot Striping, Curbing, Concrete paving, Concrete retaining wall, Fencing & Gates, Site Utilities, Storm Sewer, Underground Detention System, Landscaping, Irrigation, Concrete, Block Work, Stone Veneer... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Spring Hill |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Water Supply and Storage, Cement, Power Transmission, Road, Waste Processing and Treatment, Metal, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
