Calico Ghost Town Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Calico Ghost Town Bridge Replacement . SCOPE OF WORK: The Contractor shall provide all necessary supervision, labor, equipment, materials, and transportation necessary to complete the Project. This includes but is not limited to the following: Demolishing and properly disposing of the existing pedestrian wood bridge, electrical conduit, and wires at the designated bone yard area. Procure a prefabr
- Status
- Prospective
- Sector
- Steel, Power Generation (CCGT), Bridge, Road, Government, Metal, Commercial
- Location
- Crestline, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Calico Ghost Town Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Calico Ghost Town Bridge Replacement . SCOPE OF WORK: The Contractor shall provide all necessary supervision, labor, equipment, materials, and transportation necessary to complete the Project. This includes but is not limited to the following: Demolishing and properly disposing of the existing pedestrian wood bridge, electrical conduit, and wires at the designated bone yard area. Procure a prefabricated steel structure bridge as specified in the Specifications. Construct bridge abutments desi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Crestline |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT), Bridge, Road, Government, Metal, Commercial |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
