logo
ProjectBid Results

Callery Pump Station Relocation Project

Bid results · Pennsylvania · Last reported Sep 2025

Source: Dodge

Installation of a pre-fabricated duplex pump station with above ground valve vault, directionally drilling approximately 600 LF of 6 HPDE force main, approximately 800 LF of 4 HDPE electrical conduit, and approximately 800 LF of 2 HDPE gas service line. Installation of approximately 600 LF of new 10 gravity sewers by open-cut. Contract includes demolition of an existing pump station, abandonment o

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
Location
Evans City, Pennsylvania, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Callery Pump Station Relocation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Callery Pump Station Relocation Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Evans City, Pennsylvania, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of a pre-fabricated duplex pump station with above ground valve vault, directionally drilling approximately 600 LF of 6 HPDE force main, approximately 800 LF of 4 HDPE electrical conduit, and approximately 800 LF of 2 HDPE gas service line. Installation of approximately 600 LF of new 10 gravity sewers by open-cut. Contract includes demolition of an existing pump station, abandonment of existing sewers, and tying new force main into existing force main.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Pennsylvania

City

Evans City

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government

Article published date

2025-10-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project