Callide C3 Unit Pre-emptive Maintenance
Sector: Power Generation (CCGT) • Location: Queensland, Australia
Source: Energy Source & Distribution
CS Energy is extending the outage of Unit C3 at Callide C Power Station by three days to perform additional pre-emptive maintenance work. This work addresses deterioration and cracking in the high pressure steam piping, unrelated to the clinker incident on April 4, 2025. The maintenance is being done ahead of the scheduled overhaul in August 2025 to ensure safety and reliability.
- Status
- Under Construction
- Sector
- Power Generation (CCGT)
- Location
- Queensland, Australia
- Updated
- 22 Jul 2026
- Source
- Energy Source & Distribution
ConstructChat
Ask ConstructChat about Callide C3 Unit Pre-emptive Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under maintenance |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CS Energy is extending the outage of Unit C3 at Callide C Power Station by three days to perform additional pre-emptive maintenance work. This work addresses deterioration and cracking in the high pressure steam piping, unrelated to the clinker incident on April 4, 2025. The maintenance is being done ahead of the scheduled overhaul in August 2025 to ensure safety and reliability. |
Original sector | Energy |
Location
Country | Australia |
State | Queensland |
Source
Source | Energy Source & Distribution |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project