Calpine Administration Building
One of 10,000+ projects Taiyo tracks in Pennsylvania.
Source: Dodge
The 8,200 sq ft one-story all block structure will be built on existing impervious surface, containing 11 offices, centralized control room, maintenance shop and storage which will tie into all existing facilities. 1055 Pikes Peak Rd, Land Development Plan to construct an 8,200 +/- sqft Administration Building Map BQ Parcel 11L
- Status
- Prospective
- Sector
- Residential, Commercial, Manufacturing (Industrial)
- Location
- Delta, Pennsylvania, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Calpine Administration Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The 8,200 sq ft one-story all block structure will be built on existing impervious surface, containing 11 offices, centralized control room, maintenance shop and storage which will tie into all existing facilities. 1055 Pikes Peak Rd, Land Development Plan to construct an 8,200 +/- sqft Administration Building Map BQ Parcel 11L |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Delta |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
