logo
ProjectClosed

Calvert Avenue Stream Stabilization

Closed · South Carolina · Last reported Apr 2025

Source: Dodge

The Project includes the following Work: The proposed design is a combination of imbricated boulder revetment and stream bank grading with matting to avoid the stream from exposing the existing 12-inch sanitary sewer line.

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Clinton, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Calvert Avenue Stream Stabilization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Calvert Avenue Stream Stabilization” is an infrastructure initiative in the Water Supply and Storage sector, located in Clinton, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following Work: The proposed design is a combination of imbricated boulder revetment and stream bank grading with matting to avoid the stream from exposing the existing 12-inch sanitary sewer line.

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Clinton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2025-04-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project