Calvin Dr & Cedar Tree Ln Stabilization & Overlay
Sector: Commercial • Location: Columbia, Missouri, United States of America
Source: Dodge USA
Cement stabilization of existing gravel road sections using a road reclaiming machine, road compactors, & road graders. After stabilization, roads shall receive a 2.5" thick asphalt surface. Construction areas include Calvin Dr, from Rothie Dr to Wren School Rd (Approx 20,702 SY), and Cedar Tree Ln, from Bayte Ln to existing chip seal (Approx 28,326 SY). Work shall also include the placement of a
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Cement stabilization of existing gravel road sections using a road reclaiming machine, road compactors, & road graders. After stabilization, roads shall receive a 2.5" thick asphalt surface. Construction areas include Calvin Dr, from Rothie Dr to Wren School Rd (Approx 20,702 SY), and Cedar Tree Ln, from Bayte Ln to existing chip seal (Approx 28,326 SY). Work shall also include the placement of a 2.5" thick asphalt overlay on an existing paved portion of Calvin Dr from State Rte M to Rothie Dr. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in United States of America
- 2023 Citywide Pedestrian Safety Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
- FCS Child Care Project
- Brotman Hall (BH) Suite 377 Renovation
- Fine Arts and Housing Cooling Engineering Study
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
