Calvin Klein (Calexico, CA)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Renovation Of An Dusting Retail Tenant Space. Building: New Interior Partitions, New Fixtures And Finishes. New Ceiungs And Soffits. Electrical: Existing Electrical Service. Add New Power And Lighting To Suit Needs Per Electrical Sheets Mecham New Ductwork And Diffusers, Hvac Units Are Provided By Ll And Costing Pl Umring: Toilet Room And Service Sink By Li. New Break Area Sink And Water Cooler Io
- Status
- Closed
- Sector
- Broadband, Water Supply and Storage, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial, Telecommunications
- Location
- Calexico, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Calvin Klein (Calexico, CA)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovation Of An Dusting Retail Tenant Space. Building: New Interior Partitions, New Fixtures And Finishes. New Ceiungs And Soffits. Electrical: Existing Electrical Service. Add New Power And Lighting To Suit Needs Per Electrical Sheets Mecham New Ductwork And Diffusers, Hvac Units Are Provided By Ll And Costing Pl Umring: Toilet Room And Service Sink By Li. New Break Area Sink And Water Cooler Iow Vol Tacf: Low Voltage Wiring And Installation Of Telephone, Internet, Security Camera, Wwi Syst... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Calexico |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Broadband, Water Supply and Storage, Power Generation (CCGT), Residential, Manufacturing (Industrial), Commercial, Telecommunications |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
