Calvin Rampton Complex Deluge System Removal & Remodel
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Removal of existing deluge system, upgrade to existing fire sprinkler system, upgrade to existing fire alarm system, upgrade to existing smoke evacuation system, new storefront windows to separate atrium space from the adjacent occupied spaces. Trades include: Selective Demolition, Metal Fabrications, Decorative Formed Metal, Applied Fire Protection, Penetration Firestopping, Joint Sealants, Alumi
- Status
- Prospective
- Sector
- Metal, Manufacturing (Industrial), Commercial, Education, Steel, Residential, Government
- Location
- Provo, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Calvin Rampton Complex Deluge System Removal & Remodel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal of existing deluge system, upgrade to existing fire sprinkler system, upgrade to existing fire alarm system, upgrade to existing smoke evacuation system, new storefront windows to separate atrium space from the adjacent occupied spaces. Trades include: Selective Demolition, Metal Fabrications, Decorative Formed Metal, Applied Fire Protection, Penetration Firestopping, Joint Sealants, Aluminum-Framed Storefronts, Glazing, Decorative Glass, Non-Structural Metal Framing, Gypsum Board, In... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Provo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Manufacturing (Industrial), Commercial, Education, Steel, Residential, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
