Calypso Mixed Use Development
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
6 Story mixed-use development on 1.19 Acres at 130 Center Street. The project will consist of two retail commercial spaces with food use flexibility, 233 residential single room occupancy (SRO) units, and 209 parking spaces.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Residential, Commercial, Road, Car parking, Automotive
- Location
- Santa Cruz, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Calypso Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 6 Story mixed-use development on 1.19 Acres at 130 Center Street. The project will consist of two retail commercial spaces with food use flexibility, 233 residential single room occupancy (SRO) units, and 209 parking spaces. |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Cruz |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial, Road, Car parking, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
