Cambodia : Urban Infrastructure Development Project
Sector: Water Supply and Storage • Location: Cambodia
Source: aiib
Cambodia's urban population is projected to reach one-third of the total by 2030. While the capital city of Phnom Penh remains the country's primary urban center, secondary cities face growing demand for basic urban services such as water supply, sanitation, and drainage. Municipal investment has not kept pace with this shift, leaving these cities with limited access to climate and disaster-resili
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Commercial
- Location
- Cambodia
- Updated
- 19 Nov 2026
- Source
- aiib
ConstructChat
Ask ConstructChat about Cambodia : Urban Infrastructure Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Cambodia's urban population is projected to reach one-third of the total by 2030. While the capital city of Phnom Penh remains the country's primary urban center, secondary cities face growing demand for basic urban services such as water supply, sanitation, and drainage. Municipal investment has not kept pace with this shift, leaving these cities with limited access to climate and disaster-resilient urban infrastructure. This is particularly critical given Cambodia's exposure to intense seasonal flooding compounded by inadequate drainage capacity. The Government of Cambodia has set a goal of achieving universal and equitable access to safe and affordable drinking water by 2030 and is prioritizing investment in public water utilities to expand treatment capacity and pipe networks. However, less than 60% of the urban population currently has access to piped water, and less than 40% has access to improved sanitation. The project will address these challenges by investing in climate-resilient sanitation and drainage systems across four secondary cities: Kampong Chhang, Kampong Cham, Don Kaev and Prey Veng, located in the vicinity of Phnom Penh. The Project has the following components: Component 1: Drainage and Wastewater Management in 3 secondary cities . This component will support construction of climate-resilient sewerage, wastewater treatment plant (WWTP), priority stormwater drainage, and paved flood control dyke roads in three secondary cities: Kampong Chhnang, Don Kaev, and Prey Veng. Component 2: Drainage and Wastewater Management in Kampong Cham . This component will support construction of sewerage network, wastewater treatment facilities, priority stormwater drainage, and paved flood control dyke roads in Kampong Cham. It is proposed to be co-financed by the Abu Dhabi Fund for Development (ADFD). Component 3: Project Management . This component will support the project management during the implementation, including training and capacity-building activities for national, provincial, and local government entities to strengthen their capacity to support project implementation. |
Original sector | Urban |
Budget |
Location
Country | Cambodia |
Source
Source | aiib |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial |
Article published date | 2026-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
