Cambodia: Integrated Water Resources Management Project
One of 9,339 projects Taiyo tracks in Cambodia.
Source: Asian Infrastructure Investment Bank (AIIB)
The Project will be co-financed with the Asian Development Bank (ADB), who will be the lead co-financier. To achieve the objective, the Project will: (i) strengthen the planning and coordination capacities of the provincial River Basin Management Committees (RBMCs); (ii) increase irrigation water availability in the dry season through construction and rehabilitation of water regulator and canals;
- Status
- Prospective
- Sector
- Biomass, Raw Materials, Water Supply and Storage, Residential, Commercial, Chemical (Industrial), Automotive, Manufacturing (Industrial), Fertilizers, Waste Processing and Treatment, Government
- Location
- Cambodia
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Cambodia: Integrated Water Resources Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will be co-financed with the Asian Development Bank (ADB), who will be the lead co-financier. To achieve the objective, the Project will: (i) strengthen the planning and coordination capacities of the provincial River Basin Management Committees (RBMCs); (ii) increase irrigation water availability in the dry season through construction and rehabilitation of water regulator and canals; and (iii) improve flood-control and drainage facilities to reduce flood risks in the wet season. Three components have been proposed for the Project: Component 1 - Strengthen the planning and coordination capacities of water resources management of provincial RMBCs; Component 2 - Increase irrigation water availability during the dry season; and Component 3 - Reduce flood risks during the wet season. |
Original sector | Water |
Budget |
Location
Country | Cambodia |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Biomass, Raw Materials, Water Supply and Storage, Residential, Commercial, Chemical (Industrial), Automotive, Manufacturing (Industrial), Fertilizers, Waste Processing and Treatment, Government |
Article published date | 2025-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in Cambodia
- Soma Hak Se Biomass Plant
- ABC Phnom Penh Biomass Plant
- Meanchey Biomass Power Plant
- Integrated Urban Environmental Management in the Tonle Sap Basin Project
- Cambodia: Climate Adaptive Irrigation and Sustainable Agriculture for Resilience Project (CAISAR)
- Livable, Resilient, and Water-Secure Cities Investment Program
- Investment in New Forests Tropical Asia Forest Fund 2 L.P.
- Southeast Asia Resilient and Water Secure Cities Facility
