logo
ProjectProposed

Cambodia: Integrated Water Resources Management Project

The status, timeline and source of this project. A free account opens every field.

Source: Asian Infrastructure Investment Bank (AIIB)

The Project will be co-financed with the Asian Development Bank (ADB), who will be the lead co-financier. To achieve the objective, the Project will: (i) strengthen the planning and coordination capacities of the provincial River Basin Management Committees (RBMCs); (ii) increase irrigation water availability in the dry season through construction and rehabilitation of water regulator and canals;

Status
Prospective
Sector
Water Supply and Storage, Biomass, Raw Materials, Residential, Waste Processing and Treatment, Commercial, Chemical (Industrial), Fertilizers, Automotive, Manufacturing (Industrial), Government
Location
Cambodia
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Cambodia: Integrated Water Resources Management Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cambodia: Integrated Water Resources Management Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Cambodia. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project will be co-financed with the Asian Development Bank (ADB), who will be the lead co-financier. To achieve the objective, the Project will: (i) strengthen the planning and coordination capacities of the provincial River Basin Management Committees (RBMCs); (ii) increase irrigation water availability in the dry season through construction and rehabilitation of water regulator and canals; and (iii) improve flood-control and drainage facilities to reduce flood risks in the wet season. Three components have been proposed for the Project: Component 1 - Strengthen the planning and coordination capacities of water resources management of provincial RMBCs; Component 2 - Increase irrigation water availability during the dry season; and Component 3 - Reduce flood risks during the wet season.

Original sector

Water

Budget

Location

Country

Cambodia

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Raw Materials, Residential, Waste Processing and Treatment, Commercial, Chemical (Industrial), Fertilizers, Automotive, Manufacturing (Industrial), Government

Article published date

2024-10-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project