logo

Cambodia Water Security Improvement Project

Sector: Water Supply and Storage • Location: Cambodia

Source: World Bank

Project
Active

The proposed project consists of four components with an estimated total financing cost of US$150 million of which US$145 million and is expected to be implemented over a period of six years: Component 1: Improved water resources planning and institution (US$10 million). This component will review policies and regulations, and their adequacy in supporting water resources management and dam safety,

Status
Prospective
Sector
Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Hydro, Raw Materials, Government, Commercial
Location
Cambodia
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Cambodia Water Security Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cambodia Water Security Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Cambodia. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of four components with an estimated total financing cost of US$150 million of which US$145 million and is expected to be implemented over a period of six years: Component 1: Improved water resources planning and institution (US$10 million). This component will review policies and regulations, and their adequacy in supporting water resources management and dam safety, with the overarching goal of operationalizing them. Furthermore, the component would strengthen data collection, analysis, and transboundary data sharing with Vietnam. The improved regulatory framework and strengthened data and analytics would result in the preparation of RBMPs as a long-term basin wide development tool to manage and sustain water resources and guide strategic investments in the selected priority basins. The component would support establishing RBCs to support and coordinate basin-level development. Finally, the component would develop institutional capacity of MOWRAM, PDOWRAM and other provincial stakeholders. Component 2: Improve and Sustain Water Service Delivery (US$112 million). In order to achieve the delivery of improved and sustained water services to end users, the component will finance: 1) rehabilitation and upgrading of targeted existing water resources infrastructure for irrigation, water supply, and flood control, and 2) establish new or staff existing FWUCs and support financial sustainability of FWUCs, and 3) provide technical assistance to PDWRAMs/FWUCs to manage, operate and maintain (MOM) these systems in an effective manner. The Component will finance the rehabilitation of existing irrigation systems for the Svay Chrum and Srae Huy sub-basins of the 3S and 5P. This includes: (a) the rehabilitation and upgrading of intake facilities and water regulating structures for improved water resources management; (b) the modernization of small-scale water storage units for enhanced drought risk management; (c) the rehabilitation of drainage and irrigation canal systems for improved flood risk management; and (d) covering annual O&M costs throughout project implementation following standard O&M procedures. This component will also finance the preparation of the engineering designs and construction activities for two other subprojects in most flood and drought-prone areas, which would be selected in the first year of the project. The component would bring in critical climate benefits, ensuring water security, reducing the impacts of both floods and droughts by regulating water in the fields, reducing leaching of fertilizers into nearby water bodies and reduce sedimentation which would lead to better water quality. Modernizing water storage units would enhance water availability and serve as an additional buffer during drier periods. Finally, the rehabilitation of drainage and irrigation channels can reduce the impact of intense precipitation and floods, reduces soil and nutrient loss, controls salinity, and prevents soil erosion. Component 3: Support Services to Increase Climate Resilience and Water Use in Irrigated Agriculture (US$18 million). This component will support MAFF, the PDAFFs, and local stakeholders building on the investments carried out under Component 1 and 2 and building on activities and other relevant World Bank projects for increased agricultural productivity. The focus will be on improving efficiency of water use and the integration of crop and water management at farm level, including climate smart agricultural practices and adoption of climate resilient crops and low emission agriculture technologies. Component 4. Project Management, Coordination, and Monitoring and Evaluation (US$5 million). The objective of this component is to provide adequate supports to Executive Agency and Implementing Agencies to provide institutional and technical capacity building, coordination, and social and environmental risks management, communication, and M&E for project management at all levels. Component 5: Contingent Emergency Response Component (CERC) (US$0). This allows an immediate response to an eligible crisis or emergency, as needed, from other components to partially cover emergency response and recovery costs. This component could also be used to channel additional funds should they become available because of the emergency. An Emergency Response Manual will be prepared in year 1 of the project and included in the POM, which will describe implementation arrangements for the component, including its activation process, the roles and responsibilities of implementing agencies, a list of activities that may be financed, environmental and social (E&S) aspects, and fiduciary arrangements.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Cambodia

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Hydro, Raw Materials, Government, Commercial

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project