Cambridge Grove Stream Stabilization
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Stream Stabilization along UT to Caldwell Station Creek: 672 LF of channel and bank stabilization Stream Bypass Pumping 6 Log Vanes with Log Sills 11 Boulder Sills 2 Boulder J-Hooks 1 Boulder Vane 80 LF of Brush Toe 58 LF of Soil Lifts Boulder Steps 117 SY of Driveway Replacement
- Status
- Closed
- Sector
- Government, Road, Commercial
- Location
- Huntersville, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cambridge Grove Stream Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Stream Stabilization along UT to Caldwell Station Creek: 672 LF of channel and bank stabilization Stream Bypass Pumping 6 Log Vanes with Log Sills 11 Boulder Sills 2 Boulder J-Hooks 1 Boulder Vane 80 LF of Brush Toe 58 LF of Soil Lifts Boulder Steps 117 SY of Driveway Replacement |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Huntersville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Commercial |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
