Cambridge Lane to Gray Road 24" Line Extension
One of 10,000+ projects Taiyo tracks in Alabama.
Source: Dodge
Installation of approximately 12,500 linear feet of 24-inch diameter water transmission main. All pipe will be Ductile Iron Pipe (DIP). The contract to be bid will include restrained joint fittings, isolation valves, air release valves, bored roadway crossings, bored stream crossings, and connections to the existing system.
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Government, Road, Commercial, Steel
- Location
- Athens, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cambridge Lane to Gray Road 24" Line Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of approximately 12,500 linear feet of 24-inch diameter water transmission main. All pipe will be Ductile Iron Pipe (DIP). The contract to be bid will include restrained joint fittings, isolation valves, air release valves, bored roadway crossings, bored stream crossings, and connections to the existing system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Athens |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Government, Road, Commercial, Steel |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
