logo
ProjectClosed

Camden Lift Station

Closed · Washington

Source: City of Bothell

This project was to retrofit the existing lift station and do other associated site improvements., Lift station #4 was built in the mid-1980s as part of the Camden Highlands housing development and serves approximately 24 single family residences. The lift station has reached the end of its design life and maintaining the outdated lift station is becoming time consuming and expensive. The pump man

Status
Closed
Sector
Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage, Residential, Road, Government
Location
Bothell, Washington, United States of America
Updated
22 Jul 2026
Source
City of Bothell

ConstructChat

Ask ConstructChat about Camden Lift Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Camden Lift Station” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Bothell, Washington, United States of America. Taiyo aggregates data on it from City of Bothell.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project was to retrofit the existing lift station and do other associated site improvements., Lift station #4 was built in the mid-1980s as part of the Camden Highlands housing development and serves approximately 24 single family residences. The lift station has reached the end of its design life and maintaining the outdated lift station is becoming time consuming and expensive. The pump manufacturer no longer provides support for the pumps and the city operations crew is having to machine custom parts in order to maintain the lift station. In addition to the time and expense necessary to maintain the outdate lift station, frequent mechanical failures create the risk of sewage backing up into adjacent homes., A temporary sewer bypass system was installed ahead of the project, so there were no disruptions to the 24 single family homes served by the lift station. A 20-foot lane will be maintained around the project site, so no disruptions to thoroughfare or adjacent property ingress/egress happened. Construction started in Spring of 2022 and was completed in Summer of 2022.,

Location

Country

United States of America (USA)

State

Washington

City

Bothell

Source

Source reliability

High

Source

City of Bothell

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage, Residential, Road, Government

Article published date

2023-10-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project