Camden Lift Station
Closed · Washington
Source: City of Bothell
This project was to retrofit the existing lift station and do other associated site improvements., Lift station #4 was built in the mid-1980s as part of the Camden Highlands housing development and serves approximately 24 single family residences. The lift station has reached the end of its design life and maintaining the outdated lift station is becoming time consuming and expensive. The pump man
- Status
- Closed
- Sector
- Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage, Residential, Road, Government
- Location
- Bothell, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Bothell
ConstructChat
Ask ConstructChat about Camden Lift Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project was to retrofit the existing lift station and do other associated site improvements., Lift station #4 was built in the mid-1980s as part of the Camden Highlands housing development and serves approximately 24 single family residences. The lift station has reached the end of its design life and maintaining the outdated lift station is becoming time consuming and expensive. The pump manufacturer no longer provides support for the pumps and the city operations crew is having to machine custom parts in order to maintain the lift station. In addition to the time and expense necessary to maintain the outdate lift station, frequent mechanical failures create the risk of sewage backing up into adjacent homes., A temporary sewer bypass system was installed ahead of the project, so there were no disruptions to the 24 single family homes served by the lift station. A 20-foot lane will be maintained around the project site, so no disruptions to thoroughfare or adjacent property ingress/egress happened. Construction started in Spring of 2022 and was completed in Summer of 2022., |
Location
Country | United States of America (USA) |
State | Washington |
City | Bothell |
Source
Source reliability | High |
Source | City of Bothell |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage, Residential, Road, Government |
Article published date | 2023-10-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2