Cameron Prairie NWR Pole Barn Construction REBID
Sector: Raw Materials • Location: Bell City, Louisiana, United States of America
Source: Dodge
This project is to construct a new pre-engineered metal building (PEMB), 50ft X110ft, Pole Barn constructed over the existing concrete slab, ensuring it is complete and fully functional. The contractor is expected to conduct field investigations as necessary to assess and reflect existing conditions at the job site. The work involves construction of building components and utilities, as well as pr
- Status
- Closed
- Sector
- Raw Materials, Power Transmission, Cement, Metal, Power Generation (CCGT), Commercial
- Location
- Bell City, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cameron Prairie NWR Pole Barn Construction REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to construct a new pre-engineered metal building (PEMB), 50ft X110ft, Pole Barn constructed over the existing concrete slab, ensuring it is complete and fully functional. The contractor is expected to conduct field investigations as necessary to assess and reflect existing conditions at the job site. The work involves construction of building components and utilities, as well as procuring and providing all materials, equipment, services, and labor reasonably inferred from the ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Bell City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Transmission, Cement, Metal, Power Generation (CCGT), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
