logo

Cameroon - Construction of oil rig repair facilities in Limbé

Sector: Oil and Gas • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The proposed project is part of Cameroon's industrial development policy. It aims to provide the Cameroon Shipyard and Industrial Shipyard (C.N.I.C.) with a deepwater site for the repair of oil platforms and associated vessels. Indeed, the CNIC site (based at the port of Douala) limits the arrival of ships due to the draught reduced in places to -5/-6 m. This extremely strong constraint is no long

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Construction of oil rig repair facilities in Limbé” is an infrastructure initiative in the Oil and Gas sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is part of Cameroon's industrial development policy. It aims to provide the Cameroon Shipyard and Industrial Shipyard (C.N.I.C.) with a deepwater site for the repair of oil platforms and associated vessels. Indeed, the CNIC site (based at the port of Douala) limits the arrival of ships due to the draught reduced in places to -5/-6 m. This extremely strong constraint is no longer compatible with the characteristics of many ships and has led the CNIC to look for a new site to accommodate ships and platforms wishing to carry out naval repairs. The Project includes the construction of onshore and offshore facilities for the repair of platforms and ships related to oil activities at the Cap Limboh site west of the City of Limbe, as well as the acquisition of materials and equipment. The work is planned over 30 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data