logo

Cameroon - Lom-Pangar Hydroelectric Project

Sector: Water Supply and Storage • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The Lom-Pangar Hydroelectric Project is an overarching project that underpins the strategy to tap the hydroelectric power potential of the Sanaga River. The project comprises the construction of an impounding dam to supply water during low-flow period to the Song-Loulou power plant (335 MW) and boost the output of the Edea plant (224 MW), thus increasing the dependable power of the two plants loca

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Lom-Pangar Hydroelectric Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Lom-Pangar Hydroelectric Project is an overarching project that underpins the strategy to tap the hydroelectric power potential of the Sanaga River. The project comprises the construction of an impounding dam to supply water during low-flow period to the Song-Loulou power plant (335 MW) and boost the output of the Edea plant (224 MW), thus increasing the dependable power of the two plants located downstream from 450 MW in 2010 to 729 MW in 2015. A 30 MW hydroelectric plant will be constructed at the foot of the dam and connected to the Bertoua thermal plant by a 105 km long 90 kV line. This line will be extended by 200 km to the localities of Batouri and Abong-Mbang to make the transmission and distribution systems more reliable and to provide power to 150 localities in the East Region. Lastly, the project also includes the conduct of a study on the Cameroon Electricity Transmission Network Master Plan so as to enhance the country’s hydroelectric potential. The total project cost is estimated at UA 264.49 million. Its implementation will span 48 months as from 2011.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data