Cameroon - Lom-Pangar Hydroelectric Project
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The Lom-Pangar Hydroelectric Project is an overarching project that underpins the strategy to tap the hydroelectric power potential of the Sanaga River. The project comprises the construction of an impounding dam to supply water during low-flow period to the Song-Loulou power plant (335 MW) and boost the output of the Edea plant (224 MW), thus increasing the dependable power of the two plants loca
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Cameroon - Lom-Pangar Hydroelectric Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lom-Pangar Hydroelectric Project is an overarching project that underpins the strategy to tap the hydroelectric power potential of the Sanaga River. The project comprises the construction of an impounding dam to supply water during low-flow period to the Song-Loulou power plant (335 MW) and boost the output of the Edea plant (224 MW), thus increasing the dependable power of the two plants located downstream from 450 MW in 2010 to 729 MW in 2015. A 30 MW hydroelectric plant will be constructed at the foot of the dam and connected to the Bertoua thermal plant by a 105 km long 90 kV line. This line will be extended by 200 km to the localities of Batouri and Abong-Mbang to make the transmission and distribution systems more reliable and to provide power to 150 localities in the East Region. Lastly, the project also includes the conduct of a study on the Cameroon Electricity Transmission Network Master Plan so as to enhance the country’s hydroelectric potential. The total project cost is estimated at UA 264.49 million. Its implementation will span 48 months as from 2011. |
Original sector | Energy |
Budget |
Location
Country | Cameroon |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Cameroon
- PROJET DE PRODUCTION DES PROVENDERIES, POULETS, PORCS POUR ABATTAGE.
- Cameroon - Yaounde Sanitation Project – Phase II (PADY.2)
- Mise en place d'un projet de production de produits à base de banane plantain
- Cameroon - Agricultural Value Chain Development Project
- Cameroon - Project to Develop Access Roads to The Industrial and Port Area of Kribi (PARZIK)
- PROJET DE CONSTRUCTION D'UNE UNITE DE PRODUCTION DES BLOCS DE BETON ET ASSIMILES
- Palm Oil Production
- Cameroon - Transport Sector Support Programme Phase 1: Development of the Batchenga-Ntui-Yoko-Lena Road