logo

Cameroon - Nachtigal Hydro Power Project

Sector: Road • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The present intervention concerns the Nachtigal Hydro Power Project. It’s a hydroelectric plant of 420 MW, jointly designed by the Republic of Cameroon, EDF International (Electricity of France) and the IFC. The project is to be built on the Sanaga River, 65 km northeast of Yaoundé, which has Cameroon's largest hydropower potential. The plant should be connected to the Southern Interconnected Grid

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Nachtigal Hydro Power Project” is an infrastructure initiative in the Road sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the Nachtigal Hydro Power Project. It’s a hydroelectric plant of 420 MW, jointly designed by the Republic of Cameroon, EDF International (Electricity of France) and the IFC. The project is to be built on the Sanaga River, 65 km northeast of Yaoundé, which has Cameroon's largest hydropower potential. The plant should be connected to the Southern Interconnected Grid (RIS), which accounts for 94% of Cameroon's electricity consumption. The project also includes the construction of a 225 kV substation and a 50 km transmission line to the Nyom 2 connection station. Nachtigal will be the third project to benefit from the hydroelectric potential of the Sanaga River, after EDEA (276 MW commissioned in the 1950s) and Song Loulou (384 MW in the late 1970s). The project site has good all-season road access, which will facilitate the transportation of equipment during the construction phase. The hydroelectric facilities and the production substation are located in the same perimeter, while the transmission line is located in another perimeter.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data