logo
Project

Cameroon - Nachtigal Hydro Power Project

Sector: Hydro • Location: Cameroon

Source: African Development Bank (AfDB)

The present intervention concerns the Nachtigal Hydro Power Project. It’s a hydroelectric plant of 420 MW, jointly designed by the Republic of Cameroon, EDF International (Electricity of France) and the IFC. The project is to be built on the Sanaga River, 65 km northeast of Yaoundé, which has Cameroon's largest hydropower potential. The plant should be connected to the Southern Interconnected Grid

Sector
Hydro, Power Generation (CCGT), Road, Government
Location
Cameroon
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Cameroon - Nachtigal Hydro Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Nachtigal Hydro Power Project” is an infrastructure initiative in the Hydro sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention concerns the Nachtigal Hydro Power Project. It’s a hydroelectric plant of 420 MW, jointly designed by the Republic of Cameroon, EDF International (Electricity of France) and the IFC. The project is to be built on the Sanaga River, 65 km northeast of Yaoundé, which has Cameroon's largest hydropower potential. The plant should be connected to the Southern Interconnected Grid (RIS), which accounts for 94% of Cameroon's electricity consumption. The project also includes the construction of a 225 kV substation and a 50 km transmission line to the Nyom 2 connection station. Nachtigal will be the third project to benefit from the hydroelectric potential of the Sanaga River, after EDEA (276 MW commissioned in the 1950s) and Song Loulou (384 MW in the late 1970s). The project site has good all-season road access, which will facilitate the transportation of equipment during the construction phase. The hydroelectric facilities and the production substation are located in the same perimeter, while the transmission line is located in another perimeter.

Original sector

Energy

Budget

Location

Country

Cameroon

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Road, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project