logo

Cameroon - Numba-Bachuo Akagbe Road Development Project

Sector: Oil and Gas • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The Numba-Bachuo Akagbe Road Development Project was designed to contribute to the strengthening of the country's transport infrastructure. Through the reduction of transport costs, the project meets the expectations of the population who had great difficulty in transporting their products to the consumption centres. In this way, it is a strategic lever in the process of reducing poverty at the ho

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Numba-Bachuo Akagbe Road Development Project” is an infrastructure initiative in the Oil and Gas sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Numba-Bachuo Akagbe Road Development Project was designed to contribute to the strengthening of the country's transport infrastructure. Through the reduction of transport costs, the project meets the expectations of the population who had great difficulty in transporting their products to the consumption centres. In this way, it is a strategic lever in the process of reducing poverty at the household level. The Numba - Bachuo Akagbe road should contribute to extending the length of paved roads in good condition by 52 km. However, despite the increase in the length of paved roads in good condition brought about by the Numba-Bachuo Akagbe project, the measures taken to mitigate the main risks of the project and ensure sustainability have not been effective. The project has two (02) main components, namely: (A) the development of the road with a 7.00 m wide pavement and 1.5 m shoulders on each side, over a length of 50 km, including actions and measures to mitigate negative impacts on the environment, sensitization of the populations and control and monitoring of the works (B) related developments including the development of about 135 km of related tracks, the development of markets, the construction of a women's centre, the rehabilitation and reconstruction of classrooms, the construction of youth centres, the construction of boreholes for water supply, the equipping of women's groups with small agricultural processing equipment and training in their management, and the control and monitoring of these works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data