Cameroon - Numba-Bachuo Akagbe Road Development Project
Sector: Oil and Gas • Location: Cameroon
Source: African Development Bank (AfDB)
The Numba-Bachuo Akagbe Road Development Project was designed to contribute to the strengthening of the country's transport infrastructure. Through the reduction of transport costs, the project meets the expectations of the population who had great difficulty in transporting their products to the consumption centres. In this way, it is a strategic lever in the process of reducing poverty at the ho
- Sector
- Oil and Gas, Water Supply and Storage, Road, Raw Materials, Government
- Location
- Cameroon
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Cameroon - Numba-Bachuo Akagbe Road Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Numba-Bachuo Akagbe Road Development Project was designed to contribute to the strengthening of the country's transport infrastructure. Through the reduction of transport costs, the project meets the expectations of the population who had great difficulty in transporting their products to the consumption centres. In this way, it is a strategic lever in the process of reducing poverty at the household level. The Numba - Bachuo Akagbe road should contribute to extending the length of paved roads in good condition by 52 km. However, despite the increase in the length of paved roads in good condition brought about by the Numba-Bachuo Akagbe project, the measures taken to mitigate the main risks of the project and ensure sustainability have not been effective. The project has two (02) main components, namely: (A) the development of the road with a 7.00 m wide pavement and 1.5 m shoulders on each side, over a length of 50 km, including actions and measures to mitigate negative impacts on the environment, sensitization of the populations and control and monitoring of the works (B) related developments including the development of about 135 km of related tracks, the development of markets, the construction of a women's centre, the rehabilitation and reconstruction of classrooms, the construction of youth centres, the construction of boreholes for water supply, the equipping of women's groups with small agricultural processing equipment and training in their management, and the control and monitoring of these works. |
Original sector | Transport & Storage |
Budget |
Location
Country | Cameroon |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Water Supply and Storage, Road, Raw Materials, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in Cameroon
- Expansion project for production of Palm Oil and Fruit Jams
- Production of organic cosmetics, spices and teas
- chaine industrielle abattage transformation et commercialisation des poulets
- Projet d'expansion pour les produits de cacao
- PRODUCTION D'HUILE VEGETALE RAFFINE
- Cameroon - Agricultural Value Chain Development Project
- Equatorial Guinea LNG Project, Bioko Island, Punta Europa
- Dibamba Power Development Corporation
