logo
Project

Cameroon - Numba-Bachuo Akagbe Road Development Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Numba-Bachuo Akagbe Road Development Project was designed to contribute to the strengthening of the country's transport infrastructure. Through the reduction of transport costs, the project meets the expectations of the population who had great difficulty in transporting their products to the consumption centres. In this way, it is a strategic lever in the process of reducing poverty at the ho

Sector
Oil and Gas, Water Supply and Storage, Road, Raw Materials, Government
Location
Cameroon
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Cameroon - Numba-Bachuo Akagbe Road Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Numba-Bachuo Akagbe Road Development Project” is an infrastructure initiative in the Oil and Gas sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Numba-Bachuo Akagbe Road Development Project was designed to contribute to the strengthening of the country's transport infrastructure. Through the reduction of transport costs, the project meets the expectations of the population who had great difficulty in transporting their products to the consumption centres. In this way, it is a strategic lever in the process of reducing poverty at the household level. The Numba - Bachuo Akagbe road should contribute to extending the length of paved roads in good condition by 52 km. However, despite the increase in the length of paved roads in good condition brought about by the Numba-Bachuo Akagbe project, the measures taken to mitigate the main risks of the project and ensure sustainability have not been effective. The project has two (02) main components, namely: (A) the development of the road with a 7.00 m wide pavement and 1.5 m shoulders on each side, over a length of 50 km, including actions and measures to mitigate negative impacts on the environment, sensitization of the populations and control and monitoring of the works (B) related developments including the development of about 135 km of related tracks, the development of markets, the construction of a women's centre, the rehabilitation and reconstruction of classrooms, the construction of youth centres, the construction of boreholes for water supply, the equipping of women's groups with small agricultural processing equipment and training in their management, and the control and monitoring of these works.

Original sector

Transport & Storage

Budget

Location

Country

Cameroon

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Oil and Gas, Water Supply and Storage, Road, Raw Materials, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project