logo

Cameroon - Project to Strengthen and Extend the Electricity Transmission and Distribution Networks

Sector: Manufacturing (Industrial) • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The Project to Strengthen and Extend Cameroon?s Electricity Transmission and Distribution Networks is an investment project covering eight of the country?s ten regions. It stems from Cameroon?s Rural Electrification Master Plan (PDER), the studies on which were financed by the Bank, and the World Bank-funded National Energy Action Plan for Poverty Reduction (PANERP). The project is fully in keepin

Project Information FAQ

Project Information

4 Q
The project “Cameroon - Project to Strengthen and Extend the Electricity Transmission and Distribution Networks” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project to Strengthen and Extend Cameroon?s Electricity Transmission and Distribution Networks is an investment project covering eight of the country?s ten regions. It stems from Cameroon?s Rural Electrification Master Plan (PDER), the studies on which were financed by the Bank, and the World Bank-funded National Energy Action Plan for Poverty Reduction (PANERP). The project is fully in keeping with the ongoing electrification programme backed by Cameroon?s donor community and aims to strengthen and extend power transmission and distribution systems to 423 new localities with almost 335,000 new consumers, especially rural dwellers. The project consists of the following components: (i) rehabilitation and strengthening of production units; (ii) rehabilitation and extension of HV, MV and LV networks; (iii) connections, public lighting, operating and maintenance equipment; (iv) IES, IEC, MCE and training program; (v) studies of the 225 kV Memve'ele-Yaoundé line; (vi) project control and supervision; and (vii) the administration and management of the project. The total project cost is estimated at UA 58.99 million and its implementation will span a 60-month period from 2010.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data