Cameroon - Project to Strengthen and Extend the Electricity Transmission and Distribution Networks
Sector: Manufacturing (Industrial) • Location: Cameroon
Source: African Development Bank (AfDB)
The Project to Strengthen and Extend Cameroon?s Electricity Transmission and Distribution Networks is an investment project covering eight of the country?s ten regions. It stems from Cameroon?s Rural Electrification Master Plan (PDER), the studies on which were financed by the Bank, and the World Bank-funded National Energy Action Plan for Poverty Reduction (PANERP). The project is fully in keepin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project to Strengthen and Extend Cameroon?s Electricity Transmission and Distribution Networks is an investment project covering eight of the country?s ten regions. It stems from Cameroon?s Rural Electrification Master Plan (PDER), the studies on which were financed by the Bank, and the World Bank-funded National Energy Action Plan for Poverty Reduction (PANERP). The project is fully in keeping with the ongoing electrification programme backed by Cameroon?s donor community and aims to strengthen and extend power transmission and distribution systems to 423 new localities with almost 335,000 new consumers, especially rural dwellers. The project consists of the following components: (i) rehabilitation and strengthening of production units; (ii) rehabilitation and extension of HV, MV and LV networks; (iii) connections, public lighting, operating and maintenance equipment; (iv) IES, IEC, MCE and training program; (v) studies of the 225 kV Memve'ele-Yaoundé line; (vi) project control and supervision; and (vii) the administration and management of the project. The total project cost is estimated at UA 58.99 million and its implementation will span a 60-month period from 2010. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
