logo

CAMEROON - Proposed Risk Participation of the Private Sector Credit Enhancement Facility in the Loan to Nachtigal Hydro Power Company

Sector: Water Supply and Storage • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The proposed operation is an additional 6.15% risk share, or EUR 8 million of the EUR 130 million senior loan to Nachtigal Hydro Power Company (NHPC) for the construction of a new hydroelectric power plant in Cameroon. This additional support bringing the total risk share up to 35% and the maximum covered amount to EUR 45.5 million. The Nachtigal project consists of the design, construction and op

Project Information FAQ

Project Information

4 Q
The project “CAMEROON - Proposed Risk Participation of the Private Sector Credit Enhancement Facility in the Loan to Nachtigal Hydro Power Company” is an infrastructure initiative in the Water Supply and Storage sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed operation is an additional 6.15% risk share, or EUR 8 million of the EUR 130 million senior loan to Nachtigal Hydro Power Company (NHPC) for the construction of a new hydroelectric power plant in Cameroon. This additional support bringing the total risk share up to 35% and the maximum covered amount to EUR 45.5 million. The Nachtigal project consists of the design, construction and operation of a dam and hydroelectric plant on the Sanaga River. The run-of-river hydroelectric plant will generate 420 MW (equivalent to 7 x 60 MW generators) of electricity and will also have 225 kV high voltage lines covering a distance of 50 km from the project to the Nyom 2 substation, located north of Yaoundé. The project comprises a compacted concrete dam, 1,400 m wide and up to 14 m high, a 421 ha reservoir, a 3.3 km headrace canal, a hydroelectric power station with seven 60 MW turbines (for a combined capacity of 420 MW) and offices. The planned maximum flow from the power station will be 980 m3/s. The flow to the dam will be regulated upstream by the Mbakaou and Lom Pangar dams, with dry season flows of up to 650 m3/s. The project site is on the Sanaga River at Nachtigal approximately 65km north-east of Yaoundé.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data