Cameroon - Studies for the mobilisation and valorisation of rainwater through hillside reservoirs (PEMVEP)
Sector: Water Supply and Storage • Location: Cameroon
Source: African Development Bank (AfDB)
The project is part of the framework of poverty reduction and the fight against drought in a context of climate change. It consists mainly of conducting a : (i) preliminary technical studies of a maximum of 15 hill reservoir sites with associated irrigable land (FTE); (ii) feasibility studies of preliminary design studies (PDS) of favourable sites (maximum 10) following the preliminary technical s
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is part of the framework of poverty reduction and the fight against drought in a context of climate change. It consists mainly of conducting a : (i) preliminary technical studies of a maximum of 15 hill reservoir sites with associated irrigable land (FTE); (ii) feasibility studies of preliminary design studies (PDS) of favourable sites (maximum 10) following the preliminary technical studies; (iii) detailed preliminary project feasibility studies (APD) on 5 hill dam sites and associated hydro-agricultural developments; (iv) an environmental and social impact study (ESIA) for each of the 5 hill dam sites and associated hydro-agricultural developments, together with an environmental and social management plan (ESMP); and (v) an environmental and social impact assessment (ESIA) for each of the 5 hill dam sites and associated hydro-agricultural developments, together with an environmental and social management plan (ESMP): (v) draw up tender documents (DAO) for the five hill retention sites and associated hydro-agricultural developments; and then (vi) organise a round table of donors with a view to financing the development of the five hill retention sites and associated hydro-agricultural perimeters. This project is planned for a total duration of 19 months from the signature of the grant agreement and will be implemented by the Ministry of Water and Energy (MINEE). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
