logo

Cameroon - The Dibamba Power Project

Sector: Manufacturing (Industrial) • Location: Cameroon

Source: African Development Bank (AfDB)

Project

The Dibamba project aims to rapidly respond to the urgent problem of power outages and load shedding (particularly during the dry season), which have beset the country and acted as a constraint on its sustainable economic growth. The project involves the engineering, financing, and construction of an 86 MW thermal power plant and switchyard at Dibamba, with a 2-km 90 kV transmission line to connec

Project Information FAQ

Project Information

4 Q
The project “Cameroon - The Dibamba Power Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dibamba project aims to rapidly respond to the urgent problem of power outages and load shedding (particularly during the dry season), which have beset the country and acted as a constraint on its sustainable economic growth. The project involves the engineering, financing, and construction of an 86 MW thermal power plant and switchyard at Dibamba, with a 2-km 90 kV transmission line to connect the plant to the Southern Interconnected Grid, which provides electricity to the most populated and industrialized areas of the country. Its implementation will contribute directly to the development of the electric power infrastructure of Cameroon. By constructing the 86 MW power plant, the Dibamba project will provide additional capacity to support industrial expansion and meet the increase in demand, which currently runs at 6% per annum and is expected to continue for the foreseeable future. In addition, the project provides peaking and reserve capacity, thereby addressing a critical shortage in Cameroon electricity system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data