logo
Project

Cameroon - The Dibamba Power Project

One of 1,622 projects Taiyo tracks in Cameroon.

Source: African Development Bank (AfDB)

The Dibamba project aims to rapidly respond to the urgent problem of power outages and load shedding (particularly during the dry season), which have beset the country and acted as a constraint on its sustainable economic growth. The project involves the engineering, financing, and construction of an 86 MW thermal power plant and switchyard at Dibamba, with a 2-km 90 kV transmission line to connec

Sector
Manufacturing (Industrial), Power Generation (CCGT), Hydro, Geothermal, Seaport, Government
Location
Cameroon
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Cameroon - The Dibamba Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cameroon - The Dibamba Power Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Cameroon. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Dibamba project aims to rapidly respond to the urgent problem of power outages and load shedding (particularly during the dry season), which have beset the country and acted as a constraint on its sustainable economic growth. The project involves the engineering, financing, and construction of an 86 MW thermal power plant and switchyard at Dibamba, with a 2-km 90 kV transmission line to connect the plant to the Southern Interconnected Grid, which provides electricity to the most populated and industrialized areas of the country. Its implementation will contribute directly to the development of the electric power infrastructure of Cameroon. By constructing the 86 MW power plant, the Dibamba project will provide additional capacity to support industrial expansion and meet the increase in demand, which currently runs at 6% per annum and is expected to continue for the foreseeable future. In addition, the project provides peaking and reserve capacity, thereby addressing a critical shortage in Cameroon electricity system.

Original sector

Energy

Budget

Location

Country

Cameroon

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Generation (CCGT), Hydro, Geothermal, Seaport, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project